top of page
Search


CPO Volume Ramp Pushed to 2028 — and That's Not Bad News: Pluggable Optics Just Got a Longer Shelf Life (W25)
This week the market read SemiAnalysis's CPO-delay report as a death knell for optical components. It read it backwards. If CPO ramps a year later, pluggable optical modules — and the upstream EML lasers already sold out through 2027 — get an extra year of earnings. Demand hasn't weakened; only the oversold share prices have.
2 days ago


CPO's Commercial Year Begins: TSMC COUPE Volume Production and the 200G EML Bottleneck Split 2026 Optical Winners from Losers (W21)
In one week, TSMC moved CPO from slideware onto a production schedule, and Lumentum seized pricing power at the light source. Two narrow gates, TSMC COUPE capacity and 200G EML supply, now decide who gets to play in the 2026 1.6T cycle.
2 days ago
Articles: Blog2
bottom of page
