At JPM's 54th Global Technology Conference, Lumentum sent three key signals: optical cyclicality is dead, a three-stage growth engine (1.6T, scale-out, CPO) is lined up, and InP is the real bottleneck. NVIDIA has locked a huge share of capacity while other hyperscalers queue for prepaid contracts — the next capacity-lock battleground after HBM.