top of page
OPTICS · SEMICONDUCTORS · AI INFRASTRUCTURE | stt@simpletechtrend.com
Articles: Blog2
ARTICLES
Articles
Explainers, conference notes, earnings-call reads and market insights on optical communications, silicon photonics, CPO and the AI infrastructure supply chain.
Search


EPIC Photonics for AI Data Centers 2026 | Lumentum | External Laser Sources for Deployable CPO-Based AI Networks
CPO was sold on pJ/bit, but MTTR will decide it. Lumentum framed laser placement as a service-model question and answered with faceplate ELSFPs, while five other speakers pointed to the next bottleneck: up to a million fiber cores per rack.
2 days ago8 min read


Earnings Call Highlights: Coherent (COHR) Q1 FY2027 — A $20B Five-Year LTA and a 45% Margin Target, but InP Has Four Mouths to Feed and Free Cash Flow Is -$868M
Coherent signed a five-year, $20B PhotonLink agreement with one customer, raised its gross margin target to 45%, and put a $4B quarter in FY2028. But its laser insourcing mix has not moved in a year, and free cash flow was negative $868M.
Nov 510 min read


Earnings Call Highlights: Fabrinet (FN) | Q1 FY2027 — Revenue Up 51%, Fastest in a Decade; a New Building Starts Before $10B of Capacity Is Even Finished
Fabrinet grew revenue 51%, its fastest pace in ten years, and guided next quarter up to $1.65B. Capacity reaches $10B in January, yet Building 11 is already starting and the search for land goes on, while NPO, OCS and multi-rail have yet to reach the numbers.
Nov 39 min read


Earnings Highlights: Alphabet (GOOGL) | Q3 FY2026 — Cloud Up 103%, TPUs Now Sold as Systems, a $561B Backlog, and Capex Set to Rise Significantly in 2027
Google Cloud grew 103% and TPUs moved from internal use to external system sales. The 26% EPS drop is an investment-portfolio story; operating income still rose 30%. The real signals: a $561B backlog, $924B in purchase commitments, and higher 2027 capex.
Oct 307 min read


OCP Global Summit 6/6 | Radix Sets the Scale, OCS Stays in the Slow Layers
Most thousand-accelerator scale-up domains are several single-hop islands. Google's Virgo backend has no OCS on the slides; OCS stays in TPU ICI and the front end, and between buildings it is still being weighed against patch panels. STT's view: switch radix and plane count set the scale.
Oct 233 min read


OCP Global Summit 2026 | Shenzhen Litra Technology | Zhongxiang Zhang | Wavelength-Granular OCS with Solid-State OPA
Litra's OCS energy falls from 8 to 2 pJ/bit, but every point is the same ~3.2 W per port spread over faster lanes. The real news is splitting one fiber's 8 wavelengths across 8 destinations for sparse MoE traffic, if system loss holds near 3 dB.
Oct 236 min read


OCP Global Summit 2026 | Lumotive, iPronics | James Burch, Vivek Sarathy | Fast Switching OCS for AI and Hyperscale Data Centers
Google proved OCS cuts cost 30% and power 40%, but 3D MEMS switches in milliseconds. Lumotive and iPronics list microsecond to sub-nanosecond options, and admit the real bottleneck is transceiver relock and the control plane.
Oct 236 min read


OCP Global Summit 2026 | Google | Partha Ranganathan | Intelligent Infrastructure for the Intelligence Era
Google has made about 120 contributions to OCP, from Diablo 400V and LVDC to open CDUs, yet none covers the TPU or Palomar OCS. Partha Ranganathan's keynote draws the line: commoditize the plumbing, keep compute and the optical fabric.
Oct 227 min read


OCP Global Summit 2026 | Google | Sunil Ahluwalia, Jeongkeun "JK" Lee | Inside Google's Virgo Network and the Campus-as-a-Computer
Google's Virgo AI backend, as disclosed, shows no OCS: 2-layer packet switching, 200G skinny links and 8 independent planes keep 87.5% bandwidth when a plane fails. OCS stays in the front end, and scale-across is still OCS vs patch panel.
Oct 217 min read


ECOC2026 | No Technology Revolution for a Decade — Just a Manufacturing War: What Lumentum, Coherent, Marvell and Ciena Agreed On
Four incumbents on one stage, and an unromantic consensus: demand is not a bubble, technology is not the bottleneck, the war is in manufacturing. Coherent argued there will be no major technology inflection for ten years because keeping up with growth will take everything the industry has.
Oct 1010 min read


It Wasn't Physics That Killed Slow-and-Wide, It Was 60,000 Fibers: The Network's Shape Before 2029 and Who Wins
Bandwidth is per-lane speed times lane count. Push speed and you hit the SerDes energy floor; push lane count and you hit fiber and connector cost. The new fact this year: the second wall arrived first.
Oct 72 min read


Paper Analysis | One Architecture, Five Generations, 3600x Growth: Google Dissects Its Own TPUs — and the Hidden Hero, Optical Circuit Switching
Google reviews five TPU generations: an architecture set in 2017 survived the Transformer takeover and scaled 3600x. For optical readers, the key line: OCS, one of only two designs still unique to TPU, is what keeps a near-10K-chip machine alive, schedulable and deployable in stages. Power has now replaced cost as the new ceiling.
Oct 57 min read


OFC 2026 – Optical Networking for AI Data Centers: Technology Enablers and Key Applications – NTT, NVIDIA, Ciena, Lumentum, iPronics, nEye Systems
AI compute is growing 2.5X a year and electrical switching is hitting its limits. An OFC 2026 workshop showed how optical circuit switching (OCS), with its low latency and low power, is becoming a core technology for NVIDIA and the hyperscalers building next-generation AI supercomputers.
Oct 54 min read
Lumentum Makes Waves at OFC 2026: NVIDIA's $2 Billion Investment Lands, Capacity Surges, and a New Era for AI Optical Networking
At OFC 2026, Lumentum announced a $2 billion strategic investment from NVIDIA and a multi-billion-dollar OCS deal. We break down how its 400G-per-lane EML tackles the copper bottleneck and how the new Greensboro fab supports its path to $2 billion in quarterly revenue.
Oct 52 min read


Technical Analysis | Google's 8th-Gen TPU Dual Architecture: How TPU 8t and TPU 8i Tackle the Agentic AI Compute Bottleneck
Google's eighth-generation TPU splits into two architectures for the first time. STT breaks down how TPU 8t removes the training I/O bottleneck, and how TPU 8i uses large on-chip SRAM and OCS optical circuit switching to cut MoE inference network hops by 56%.
Oct 54 min read


The Optical Direct-Connect Era: How Google OCS Is Rebuilding the "Highway" of AI Compute
The OCP 2026 white paper, Lumentum's capacity lock-up race and Anthropic's 1-million-TPU deal mark the arrival of the optical direct-connect era. The full edition adds STT's golden-ratio formula, cube-position formula, a $22k OCS BOM, an 800G/1.6T BOM comparison and 13 stock view cards.
Oct 520 min read


Earnings Call Highlights: Lumentum (LITE) | FY26 Q3
Lumentum nearly doubled revenue as EML and 1.6T products drove a 2,140 bps jump in operating margin. With demand far outstripping supply, how is Lumentum using NVIDIA's capital and new capacity to chase a $2B quarterly revenue target?
Oct 53 min read


Google Writes Its Answer Into 134,000 TPUs: What Virgo Network Really Reveals Is a Win for OCS
While the market waits for CPO, Google wrote its answer into 134,000 TPUs with Virgo Network. What holds this fabric up is not exotic packaging but an OCS optical switch six years in the making, and the winners are pluggable optical modules and their upstream suppliers.
Oct 56 min read


Earnings Call Highlights: Coherent (COHR) | FY26 Q3
Coherent hits its capacity-doubling target ahead of schedule. The 6-inch InP transition is now paying off, fueling 1.6T module and OCS revenue, while CPO developed in deep partnership with NVIDIA starts contributing revenue in late 2026.
Oct 53 min read


Earnings Highlights: Viavi Solutions (VIAV) | Q4 FY2026 — Data Center Now Half of NSE Revenue, $500M Quarterly Target Pulled Forward a Full Year
Viavi's Q4 FY2026 beat the top of guidance on all three metrics, but the real signal is a new revenue engine: data center plus aerospace & defense drove nearly 70% NSE growth, and telecom capex is no longer the ceiling. Management pulled its $500M quarterly target forward a year as CPO test revenue began.
Oct 57 min read
SUBSCRIBE
Want the full supply-chain breakdown?
Subscribe to STT for premium articles: in-depth earnings-call reads, supply-chain maps and weekly industry insights.
bottom of page