top of page
OPTICS · SEMICONDUCTORS · AI INFRASTRUCTURE | stt@simpletechtrend.com
Articles: Blog2
ARTICLES
Articles
Explainers, conference notes, earnings-call reads and market insights on optical communications, silicon photonics, CPO and the AI infrastructure supply chain.
Search


After Marvell Buys Lumentum: DSPs and Lasers, Two Bottlenecks Under One Roof — 2026 W45 Industry Review
This week's earnings calls show 2027 optical module output is limited by DSPs and InP lasers. With Lumentum, Marvell holds both, and module makers will look for second sources; the selloff priced in demand doubts beyond 2028.
Nov 92 min read


Marvell Wants InP Capacity: Q3 Shows Tighter Supply Upstream as Optical Module Makers Diverge — STT Weekly Review, 2026 W44
Q3 earnings split optics into two layers: InP substrates, epitaxy and lasers are queued up by long-term contracts and prepayments, while module makers diverge on inventory. Marvell's reported pursuit of Lumentum puts a public price on InP laser capacity.
Nov 22 min read


CPO Capacity Goes 15x, but the Buyers Are the Most Cash-Strapped: NVIDIA Prepays the Back End, and China A-Shares Priced In a 2029 Split | STT Weekly 2026 W43
NVIDIA used prepayments to lock up the CPO back end: SPIL optical-engine capacity 15x and a $1.1B KYEC US test site. No China vendors made the list. But CPO is still validation-scale in 2027, and its buyers are cash-tight neoclouds.
Oct 262 min read


Optical Stocks Fell on Funding Cost, Not Orders: TSMC Raised Growth to 44%, and the Funding Bottleneck Won't Hit Shipments Until 2027 Capex Guides | 2026 W42 Industry Review
Optical stocks fell on funding cost this week, not on orders. Broadcom's warning and CoreWeave's 15% bond yield cut Lumentum about 15% in a week and sent four Taiwan names limit-down, yet TSMC raised its outlook to about 44% and no Q3 print was cut. When does the funding bottleneck reach shipments? The answer sits in 2027 capex guidance.
Oct 192 min read


A-Share Laser-Chip Stocks Priced the Wrong Year: Laser Capacity Is Booked to 2029, and InP Supply, Not the FCC List, Decides 2027 — STT Weekly W41 2026
China's laser-chip stocks went limit-down on an FCC 3.2T scenario, yet the same week Lumentum said some products face ~70% unmet demand next year and LandMark posted +190% YoY revenue. Through 2027, laser capacity sets revenue; policy and shortage meet in 2029.
Oct 122 min read


Earnings Call Highlights: Largan | Q3 2026 — Gross Margin Hits a 13-Year Low as Capex Goes All In on FAU
Largan's gross margin fell to a 13-year low, and net income growth came from non-operating income and tax. Green power costs can't be passed through before 2028, while the company bets its best fab on FAU.
Oct 109 min read


CPO Volume Ramp Pushed to 2028 — and That's Not Bad News: Pluggable Optics Just Got a Longer Shelf Life (W25)
This week the market read SemiAnalysis's CPO-delay report as a death knell for optical components. It read it backwards. If CPO ramps a year later, pluggable optical modules — and the upstream EML lasers already sold out through 2027 — get an extra year of earnings. Demand hasn't weakened; only the oversold share prices have.
Oct 57 min read


Optics Replacing Copper, Now Backed by Earnings: Broadcom Extends Visibility to 2027, but the Hardest Bottleneck Is a Single Laser (W24)
This week the bull case for optical communications got a new spokesperson: Broadcom's income statement instead of analyst decks. Demand is now locked in by earnings, but what's truly scarce can't be bought with earnings: the hardest bottleneck in the chain is a laser in short supply through 2027. The more real the demand, the more valuable the light source.
Oct 57 min read


The USD 725B Question: As the Big Four CSPs Push 2026 Capex to Astronomical Levels, Optical Communications' Real Bottleneck Quietly Moves Upstream (W21)
The Big Four CSPs lifted 2026 capex to USD 725B, NVIDIA declared the arrival of agentic AI, and Cisco doubled its AI order outlook. Yet Chinese module makers' "revenue up, profit lagging" signal shows margin in this optical bull run shifting upstream to EML/InP and epitaxy.
Oct 57 min read


NPO Is Not CPO's Appetizer: China Treats Serviceability and Yield as Architecture Choices - Where Does Taiwan Fit In?
NPO is being treated as a long-term architecture not out of technical preference, but because of supply constraints. Separable architectures create component markets - and whether NPO or CPO wins, the laser stays outside the package.
Oct 52 min read


It's Not the Chip That Gets You Designed In: Fiber Attach and a Speck of Dust
What gets a supplier into the BOM isn't pJ/bit. It's fiber-attach takt time and a single speck of dust on an end face. This is a manufacturing race, not a photonics race.
Oct 52 min read


Goldman Raises, Eoptolink Delays: Two Timelines for the Optical Supply Chain This Week
Goldman Sachs raised its optical module market forecast and sent Taiwanese suppliers limit-up three days running, while Eoptolink's earnings call pinned CPO/NPO volume production on 2027. Which year's story is the market pricing in early?
Oct 51 min read


ECTC 2026 | ASE | Characterization of Bonding Behavior and Void Formation in Chip-on-Wafer Hybrid Bonding
CoW hybrid bonding yield is first gated by the initial bonding-front angle. By tuning the angle to D so the bonding wave advances in order from center to edge, ASE lifted yield on 8×12×0.05mm dies from 2.8% to 99%, and held 95–99% on ultra-thin dies with 102.4µm warpage, 6µm pitch and organic interfaces, greatly widening the process window.
Oct 55 min read


2026 OCP APAC Summit | Edgecore × NTT ID | LPO Came Up Empty at 1.6T, Pulling the CPO Timeline Forward a Generation
Edgecore admitted 1.6T LPO is "not yet successful," so the stopgap is gone and CPO can no longer wait a generation. Three MSAs at OFC 2026 push CPO toward swappable engines, while SONiC only now has the models it needs. Hardware decides who ships; software decides who deploys at scale.
Oct 58 min read


2026 OCP APAC Summit | Microsoft | Gohar Waqar, Sushant Gupta | From Silicon to Systems
On the surface, Microsoft's keynote showcased in-house silicon; underneath, it publicly moved the AI infrastructure bottleneck from accelerators to power, cooling and networking. For Taiwan's supply chain, Microsoft's own "70% of components come from Taiwan" is an entry ticket, not a moat: the money is flowing to system-level co-design.
Oct 56 min read


Earnings Highlights: Elaser (3450) | 2Q26 — EPS Triples, but the Real Signal Is an External Light Source Not Yet in Volume Production
Elaser's 2Q26 EPS tripled QoQ, but the real signal is its revenue mix: AI optics jumped from 32.7% to 45.5% in seven months. COSA is the cash cow, AOC the second engine, and its biggest bet, ELSFP, is still not in volume production. STT flags the three numbers to watch next quarter.
Oct 59 min read


CPO's Commercial Year Begins: TSMC COUPE Volume Production and the 200G EML Bottleneck Split 2026 Optical Winners from Losers (W21)
In one week, TSMC moved CPO from slideware onto a production schedule, and Lumentum seized pricing power at the light source. Two narrow gates, TSMC COUPE capacity and 200G EML supply, now decide who gets to play in the 2026 1.6T cycle.
Oct 56 min read


US Curbs on Chinese Optical Modules Start at 3.2T: Taiwan's Re-sourcing Rally Is a Theme for Now, Revenue Comes After 2028
Taiwan's optical stocks hit limit-up on Oct 2, but the Senate bill and the reported FCC route are two different paths. The 3.2T start line and the 65% US-BOM threshold decide who wins orders, and when.
Oct 52 min read
SUBSCRIBE
Want the full supply-chain breakdown?
Subscribe to STT for premium articles: in-depth earnings-call reads, supply-chain maps and weekly industry insights.
bottom of page