top of page
OPTICS · SEMICONDUCTORS · AI INFRASTRUCTURE | stt@simpletechtrend.com
Articles: Blog2
ARTICLES
Articles
Explainers, conference notes, earnings-call reads and market insights on optical communications, silicon photonics, CPO and the AI infrastructure supply chain.
Search


Understanding NPO: Two Choices That Shape the Module, External vs Internal Laser and Integrated vs Discrete PD
Two NPO modules with the same 3.2T or 6.4T label can carry very different parts. Four figures show how laser placement and PD integration shape NPO's key components and challenges.
6 days ago10 min read


CPO Loses Two Drivers: Jensen Huang's Future and the Lumentum Deal Favor NPO, Coherent and ASICs
NVIDIA set CPO's timeline, specs and laser supply. Now Jensen Huang's future is uncertain and Lumentum is headed to Marvell. STT expects CPO's direction to hold but its volume ramp to slip, leaving the window to players that avoid a single architectural bet.
Nov 122 min read


Earnings Highlights: Astera Labs (ALAB) | FY2026 Q3 — Revenue Up 154%, Scorpio Tops a $1B Run Rate, and the 2027 Handoff Starts in the Second Half
Astera posted $585M in revenue and a Scorpio run rate past $1B, but the CFO says the first Scorpio X deployments are mostly done. NPO, Orion and custom silicon all land in 2H27 or later, so the first-half slope is the next question.
Nov 48 min read


Earnings Call Highlights: Fabrinet (FN) | Q1 FY2027 — Revenue Up 51%, Fastest in a Decade; a New Building Starts Before $10B of Capacity Is Even Finished
Fabrinet grew revenue 51%, its fastest pace in ten years, and guided next quarter up to $1.65B. Capacity reaches $10B in January, yet Building 11 is already starting and the search for land goes on, while NPO, OCS and multi-rail have yet to reach the numbers.
Nov 39 min read


Earnings Highlights: Tower Semiconductor (TSEM) Q3 FY2026 — One Quarter of Silicon Photonics Revenue Tops All of Last Year, Start Capacity Reaches a $2.8B Run Rate by Q3 2027, Contracts Reach 2029
Tower's silicon photonics revenue hit about $240M in one quarter, more than all of 2025, and start capacity triples by Q3 2027. The 62% incremental gross margin does not yet carry full depreciation, and the capacity table needs a careful read.
Nov 39 min read


LandMark Optoelectronics (3081) Q3 2026 Earnings: EPS Hits a Record NT$6.12, but the Real Signal Is 30–50% Fewer Lasers per Wafer
LandMark posted a record Q3 with EPS of NT$6.12, but the real story is the denominator: 250–300mW CW lasers for CPO yield 30–50% fewer dies per InP wafer. Capacity is locked by long-term contracts and set to grow 6x in two years, while management says gross margin will not keep climbing.
Oct 288 min read


Earnings Call Highlights: MaxLinear (MXL) | Q3 FY2026 — Infrastructure Up 210% and Now Bigger Than Everything Else Combined; 1.6T More Than Doubles Content per Module
MaxLinear's pivot is now in the P&L: infrastructure revenue rose 210% and GAAP operating margin swung from -32.7% to +13.9%. At 1.6T, DSP pricing roughly doubles and a TIA rides along, but wafer prepayments pushed operating cash flow negative. The bottleneck is the fab, not demand.
Oct 268 min read


OCP Global Summit 3/6 | Laser Specs Are Now Written by System Builders
Part 1/6 asked whether the laser must sit outside the package; this part asks where it goes and who decides. At OCP, Lumentum, Nokia, Ayar Labs and Wiwynn all talked placement, loss and coolant conditions. STT's view: laser specs are now written by system builders.
Oct 232 min read


OCP Global Summit 2/6 | NPO Lock-in Sits in the Board, Not the Optical Engine
Part 1/6 argued buyers want to switch suppliers; this piece asks whether the optical engine can actually be swapped. At OCP, Molex, Samtec and Dell all talked about board footprints, sockets and replaceable units.
Oct 232 min read


OCP Global Summit 2026 | Lightelligence, AMD | Bobby Lu, Ron Swartzentruber | Short Reach Optical Interface for Scale-up
OCP's SROI workstream wrote a requirements sheet for scale-up optics. CPO already meets the power target, but pluggable reliability is 25-50x off and cost about 10x. The first wave of optics lands where copper can't reach, beyond 3 m.
Oct 237 min read


OCP Global Summit 2026 | Molex | Bill Wilson | Enabling an Open Near-Package Ecosystem for AI Scale-Up
Molex's NPO talk barely mentioned optics; it was about the host-board footprint. Gemini Mezz puts 6.4T and 7.2T on one 100-pair pin map, and CuOperate defers the copper-or-optics decision.
Oct 237 min read


OCP Global Summit 2026 | Samtec | Tom Palkert | Open CPX Lives or Dies on a Sub-1 dB Socket
Open CPX is decided not by the optical engine but by a socket with less than 1 dB of loss. Samtec cut the host channel from 32 dB to 15 dB to enable a no-DSP linear interface, but the reliability data it cites comes from soldered CPO.
Oct 237 min read


OCP Global Summit 2026 | Meta | Granthana Rangaswamy, Siamak Amiralizadeh, Xu Wang | Integrated Optics at Scale: From 51.2T Validation to 102.4T
Meta's 51.2T CPO test is closed: zero optical-engine failures and 6x fewer link interruptions than pluggables, but 80% of what remains traces to the external laser module, root-caused to one laser-driver SMT part. At 102.4T, CPO vs NPO becomes a supply-chain question.
Oct 237 min read


OCP Global Summit 2026 | Nokia | Armaghan Eshaghi | Architecting Near-Packaged Optics for AI Datacenters
NPO and CPO share the same ~6 pJ/bit power class; the difference is that an NPO engine can be replaced. Nokia argues that lets the laser move back inside the engine, cutting laser-to-modulator loss from ~2 dB to ~0.25 dB, and only InP brings its own laser.
Oct 237 min read


OCP Global Summit 2026 | Oracle | Mark Filer | From Package to DCI: OIF Enablers in Oracle Cloud
Oracle mapped its optics from package to DCI at the OIF workshop: at every layer it buys the lowest-power option with an OIF spec. At 1.6T it drops LPO for LRO, wants NPO flexibility over CPO, and moves DCI from 400ZR to 1600ZR.
Oct 227 min read


OCP Global Summit 2026 | OIF | Jeffrey Hutchins, Sam Kocsis | Energy Efficient Interfaces: OIF Is Enabling the Next Generation of AI
Two years after listing what system vendors need, OIF is delivering the blueprint: a 12.8T NPO module at under 7 pJ/bit and over 1 Tb/s/mm, between pluggables and CPO. The new signal is that heat now limits density before connectors do, so liquid cooling is written into the module spec.
Oct 227 min read


OCP Global Summit 2026 | Capital Group | Subu Subrahmanyan | NPO Through an Investor's Lens
A fund manager at the IPEC NPO Workshop says NPO is only the fifth question investors ask. Direction is usually right, timing usually wrong, and copper sets the clock; NPO goes first because it keeps value multi-vendor.
Oct 227 min read


OCP Global Summit 2026 | Ligent Tech | Weiping Huang, Jianwei Mu | Beyond Pluggable Optics: The Emerging Role of NPO
Same 3.2T, two engines with a 5x power gap: Ligent's 23 W SiPh engine targets switch network I/O, its 4.5 W VCSEL engine targets XPU scale-up. NPO is not one product but a movable E/O boundary, and the contest is shifting to packaging and interface specs.
Oct 227 min read


OCP Global Summit 2026 | Source Photonics | Frank Chang | Revolutionizing AI Scale Up with Pluggable NPO
Scale-up is 5-10x the size of scale-out, so just 10% optical penetration recreates today's optics market. Source Photonics' answer to the post-1.6T form-factor war: stay pluggable with XPO and Open CPX.
Oct 227 min read


OCP Global Summit 2026 | Genuine Optics | David Huff | The Case for NPO Today
Optics is only 5-10% of data-center power, so the case for NPO is no longer power but scale. Genuine Optics shows NPO gives up just 1-4 pJ/bit to CPO in exchange for maintainability and an existing supply chain, with standards converging in mid-2027.
Oct 227 min read
SUBSCRIBE
Want the full supply-chain breakdown?
Subscribe to STT for premium articles: in-depth earnings-call reads, supply-chain maps and weekly industry insights.
bottom of page